Replace your old, leaking, or outdated shower with a brand new unit in Mitchell, SD. Quick 3-day installation in the same footprint—no major demolition or plumbing changes needed.
Strip out cracked tiles, moldy walls, and old shower pan
Check for water damage, apply waterproof membrane
New base, tile/acrylic walls, and glass door
New shower head, faucet, and hardware
No Plumbing Moves
3-5 Day Project
New Waterproofing
Updated Style
Many Mitchell, SD homeowners ask "should I repair or replace my shower?" Here are signs that replacement (not repair) is the better choice:
Black mold growing behind tiles or grout that won't clean indicates water penetration. Surface cleaning won't fix water damage behind walls—full shower replacement ensures proper waterproofing in Mitchell bathrooms.
Multiple cracked tiles or hollow-sounding tiles indicate waterproof membrane failure underneath. Re-grouting won't stop leaks—Mitchell showers with extensive tile damage need full replacement to prevent subfloor rot.
Water stains on walls adjacent to shower or ceiling below bathroom indicate shower pan failure. Resealing won't fix structural leaks—new waterproof pan and membrane are needed for Mitchell shower replacements.
Showers built before 2000 often lack modern waterproofing. Old tile, fiberglass, or acrylic showers deteriorate—Mitchell homeowners save money long-term by replacing old showers instead of repeatedly repairing aging fixtures.
Choose the right shower type based on your budget, timeline, and bathroom style
Licensed contractors ensuring proper waterproofing and code compliance
We install waterproof membranes (RedGard, Kerdi) on all shower walls and pans per SD building codes. This prevents water from penetrating walls and causing mold or subfloor rot in Mitchell bathrooms—the #1 reason DIY shower replacements fail.
Shower pans must slope exactly 1/4 inch per foot toward the drain for proper drainage. Our Mitchell contractors use levels and laser guides to ensure water flows correctly—no standing water or drainage issues after installation.
We remove and dispose of old shower units, tiles, and damaged drywall. Mitchell contractors inspect for water damage, repair subfloors if needed, and ensure proper backing before installing new shower—preventing future problems.
All shower replacements in Mitchell performed by licensed SD contractors with liability insurance. We handle plumbing permits, inspections, and ensure work meets current building codes for peace of mind.
Most Mitchell shower replacements completed in 3-5 days with minimal disruption. Acrylic systems install in 3 days, custom tile showers in 4-5 days due to grout curing time. Your bathroom is back in service quickly.
We stand behind our work with warranty coverage on installation and waterproofing. If leaks occur due to improper installation within warranty period, we fix it at no cost to Mitchell homeowners.
Our licensed shower replacement contractors serve all Mitchell, SD neighborhoods including ZIP code 57301. We understand local building codes, typical bathroom layouts in Mitchell homes, and SD plumbing requirements for proper shower installation.
Mitchell ZIP 57301
Professional shower replacement throughout Mitchell and surrounding SD communities.
1-2 Week Installation
Most Mitchell shower replacements scheduled within 1-2 weeks of estimate approval.
Discuss your shower replacement with Mitchell specialists
(877) 958-8726 9 AM - 8 PM CSTAnswers to common questions about shower replacement in Mitchell, SD
Call our Mitchell shower replacement specialists for personalized advice and free estimates
(877) 958-8726Available 9 AM - 8 PM CST
Professional shower replacement with waterproof installation guarantee
9 AM - 8 PM CST | Mitchell, SD
Explore our complete range of professional bathroom renovation services available throughout Mitchell, SD
Explore bathroom remodeling in these new locations